overview design and engineering prototyping tooling production inspection equipment finishing the thermold difference supply chain efficiency customer commitment accessibility
production
Keeping pace with time and technology

We know time is money, so our production department operates three shifts per day, five days per week, to meet our customers’ needs. Our operators and craftsmen average more than 15 years in the business, and their knowledge of thermoplastics, molding characteristics, current machinery and auxiliary equipment translates into a high-quality, cost-effective finished product. With a full array of modern electric and hydraulic molding equipment equipment, we can produce a variety of parts, sizes and volumes.

Machine Tonnage Barrel Size
(oz.)
Max Proj. Area
(Sq.In.)
Clamp Stroke
(In.)
Max Die Space
(In.)
Min Die Space
(In.)
Tie Bar Horiz.
(In.)
Tie Bar Vert.
(In.)
               
1 600 76.00 2,401 66.00 66.00 23.00 34.30 34.30
2 600 41.00 2,401 66.00 66.00 23.00 34.30 34.30
3 400 30.00 200 28.20 28.00 8.00 24.00 24.00
4 310 26.00 155 24.00 25.60 7.90 36.00 26.00
5 300 18.00 150 24.50 24.00 6.00 21.00 21.00
6 300 18.00 150 24.50 24.00 6.00 24.00 24.00
7 225 12.00 112.5 20.10 22.00 5.90 22.40 22.40
8 220 11.00 110 19.69 22.00 6.00 21.26 19.29
9 220 11.00 110 19.69 22.00 6.00 21.26 19.29
10 200 9.00 100 20.50 20.00 5.00 17.00 17.00
11 200 18.00 100 20.50 20.00 5.00 19.00 19.00
12 200 9.00 100 20.50 20.00 5.00 17.00 17.00
13 104 3.70 436 11.80 13.80 7.10 14.20 14.20
14 100 5.00 50 11.00 16.00 5.00 14.00 14.00
15 100 9.00 50 11.00 16.00 5.00 14.00 14.00
16 55 1.68 25 9.84 13.80 5.90 12.60 12.60